A cable schedule is a numbered list of every low voltage cable in the house, saying where each one starts, what it serves and where it ends at the rack, matched to drawings that show every device in every room. On a rural Cork self build, where you are often managing the trades yourself, that cable schedule and its drawings are what keep the electrician, the builder and the installer working to one plan. Below we explain what the drawings and schedule contain, why they matter more when there is no main contractor and how to use them on site.
Most of the self builders we talk to in Cork are building a one off house on family land or a rural site, from the hills behind Macroom to the coast around Clonakilty and Schull, with the odd replacement house closer to the city in Douglas or Carrigaline. Many of them hire the trades directly. That saves money, but it also means nobody else is checking that the speaker cable for the kitchen actually went in.
When you are the builder, the drawings do the coordinating
Irish building control allows the owner to take on the builder's role. The Building Control (Amendment) (No. 2) Regulations 2015, S.I. No. 365 of 2015 on the Irish Statute Book, state that the owner may take on the role of the builder when completing the notice of assignment, and that the owner of a new single dwelling on a single unit development may instead lodge a Declaration of Intention to Opt Out of Statutory Certification with the commencement notice. Opting out changes the paperwork at completion; it does not change the Building Regulations, so talk it through with your architect before you decide.
If you take either route, one thing follows: there is no main contractor holding the details together. Your electrician arrives on Monday, the plumber on Wednesday, the slabber the week after, and the only thing they all share is the information you give them. A set of drawings and a cable schedule, issued before first fix, is that information for everything with a low voltage cable in it.
What the drawings and the cable schedule contain
Through our survey and design service we produce a pack that covers every system we will install. Here is what you get and what it is for.
- Floor plans with every device numbered: keypads, touch screens, ceiling speakers, sensors, Wi-Fi access points, cameras and screens, room by room.
- The cable schedule: each cable on its own line, with its number, its type, the room, the device and the head end, so it can be labelled at both ends and ticked off as it goes in.
- A rack elevation: every patch panel, network switch and speaker termination drawn and colour coded by system, so the comms cupboard or plant room is sized properly.
- Network coverage: wired and wireless coverage for the house, the yard and any outbuildings.
- Lighting circuits and scenes: which circuits are controlled and what each keypad button will do.
- A control plan: how lighting, heating controls, blinds, music and security will work together.
Sample pages from a real design pack, with the client's details taken out, are on our design and documentation page.
Reading a cable schedule
A typical line might read like this: cable 14, Cat6, kitchen ceiling, Wi-Fi access point, to the network patch panel. The next line might be a four core speaker cable from the living room to the amplifier, then an alarm cable from the back door contact to the panel. The number on the schedule matches the number on the drawing and the label on the cable itself.
On a rural site this matters for a few particular reasons:
| Rural Cork situation | How the cable schedule helps |
|---|---|
| Long runs to a garage, a workshop or a yard camera | Each long run is listed with its cable type and its duct, so the right cable goes in the trench before it is backfilled |
| Trades booked weeks apart | Anyone can pick up the schedule and see what is done and what is still to go in |
| You are on site in the evenings only | You can walk the house with the drawings and tick off each cable yourself |
| A service visit years later, far from town | The engineer finds the right cable first time, which keeps the visit short |
If your site has outbuildings, our guide to wiring outbuildings on a rural Cork self build covers the ducts and long runs in more depth.
Why your electrician will be glad of it
Our founder, Kieran McGuire, is an electrician, as are some of our team, so we write the pack with the electrician in mind. Give an electrician a sketch and a list of wishes and they have to guess the quantities, the routes and the positions, then price for the risk. Give them numbered drawings and a cable schedule and they can price the job accurately, plan their routes and finish first fix without phoning you every hour.
It also draws a clear line between the two jobs. The electrician designs, installs and certifies the mains installation; our drawings show the low voltage side and which circuits the lighting control will switch or dim, so the two plans meet properly. We stay in contact with the electrician through first fix to answer questions as they come up. Our article on self build electricians and the smart home in Cork explains how we work together.
Getting the timing right
The drawings are worth most before you price the electrics, because every electrician then quotes for the same thing. A sensible order is:
- Talk to us once your floor plans are settled, ideally while the architect is still drawing.
- We survey the site or review the drawings, including any outbuildings and the route of the services.
- We issue the drawings and cable schedule, and you send them out with the electrical tender.
- Before first fix you sign off the positions, and we reissue the pack if anything has moved.
- The electrician wires from the schedule and you tick each line off as you walk the site.
Our first fix wiring guide lists what has to be in the walls before the plasterers start, and our lighting control page for Cork covers the systems we install.
Questions we are often asked
What is a cable schedule, in plain terms?
It is a list of every cable in the smart home side of the house, one line per cable, showing where it starts and finishes. Together with the drawings it means nothing is forgotten and every cable can be found again later.
Do I still need one if I am opting out of certification?
Yes. Opting out is about the certificates the council receives, not about how the house is wired. If anything, without a main contractor the schedule matters more.
Can my architect and designer see the drawings?
Yes. They can have a version with no prices on it, so they can review positions, button names and which rooms have music or a television.
What happens to the schedule after the house is finished?
It stays with you as part of the house file. Any engineer who services the system later can see exactly how it was built.
How much does the first visit cost?
A consultation or site survey is €440 plus VAT covering up to 4 hours, and extra time is €110 an hour plus VAT.
A simple way to start is with the network, because almost every other system relies on it. Send us your floor plans and site layout and we will mark the Wi-Fi access points for the house and the yard, list the cable runs back to one comms cabinet and send a priced kit list, free and with no obligation; our free Wi-Fi design offer for self builders explains how.
Book a consultation or call our Cork office on 021 202 8107.